Preparing this section
The page is loading. Browser-side project drafts and local records are not changed by this loading state.

The page is loading. Browser-side project drafts and local records are not changed by this loading state.
ShelterMetric is a practical project-intelligence platform for civil protection shelters and bunkers in Ukraine. We help businesses, public institutions, communities and international partners structure projects from early scoping through funding, procurement, acceptance, operational readiness and lifecycle operation.
ShelterMetric connects planning tools into one workflow so data does not get lost between early scoping, budgeting, financing, procurement, supplier review, acceptance, operational readiness and operations.
Capture facility type, capacity, location, preferred solution, project stage, budget, funding, target date and required work in one structured brief.
Build passport →02Estimate area or capacity, check the water-reserve scenario and create a preliminary technical request without inventing missing project data.
Open technical tools →03Break the project into known cost groups, keep risk reserve separate and check whether the project package is ready for a funding discussion.
Prepare funding package →04Define a comparable procurement scope, model implementation logistics, compare like-for-like offers and review the evidence behind the offered configuration.
Prepare procurement →05Close the contracted result and handover evidence, then separately check operational readiness, keep a factual issue log, link completed work, explicitly review resolution and continue into maintenance budgeting and lifecycle cost.
Plan operations →Visual summaries make it easier to understand where scope and budget differences come from before opening the detailed standards, calculators and procurement pages.
Access, utilities, ground conditions, neighbouring buildings and construction logistics.
Regulatory category, capacity, layout, entrances, emergency egress and structural solution.
Ventilation, power, water, sanitation, communications, fire safety and accessibility.
Design, installation, commissioning, documents, acceptance, warranty and maintenance.
UNICEF Ukraine: a repaired school basement used as a shelter in Zhytomyr. External video content is provided by UNICEF Ukraine.
Plan a school shelter project →The bar lengths are intentionally categorical, not proportional price comparisons. The examples represent different procurement scopes and should not be averaged into a market price.
The English section is designed primarily for decision-makers who need to understand, finance, specify, implement or operate a shelter project in Ukraine.
Factories, logistics hubs, offices, hotels, retail and other commercial facilities that need a structured shelter project rather than a generic product catalogue.
Explore →B2G / public sectorSchools, hospitals, municipal facilities, public buildings and infrastructure projects that require clear scope, budget logic and procurement readiness.
Explore →Sector navigationOpen the sector hub for industrial, logistics, offices, retail, hotels, residential, education, healthcare, municipalities and other project contexts.
Explore →Sector-specific requirements change the project brief. Standards, real procurement evidence, terminology, funding, procurement and operations also need their own preparation rather than being added at the end.
Understand how key Ukrainian building regulations and national standards such as DBN V.2.2-5:2023, DSTU 9195:2022 and DSTU 9329:2025 fit into project and procurement discussions.
Open →CompareSeparate regulatory category, construction format and placement before comparing PMU vs PRU, modular vs capital construction or above-ground vs underground options.
Open →Case studiesSee why capital construction, multi-lot PMU supply and repair of an existing shelter must be analysed as different project and budget categories rather than one average shelter price.
Open →TerminologyUnderstand the Ukrainian regulatory terms that international teams may encounter in project briefs, design documents and procurement materials.
Open →EducationCapacity, safe routes, accessibility, group movement, engineering systems and comparable procurement scope.
Open →HealthcarePatient categories, mobility, continuity of care and project-specific engineering requirements.
Open →InfrastructureA dedicated planning context for essential infrastructure projects that require project-specific technical review.
Open →FundingTurn the project need into a clearer package of source data, budget, financing structure, schedule and procurement readiness.
Open →ProcurementMake offers comparable, review supplier evidence and define the contracted acceptance baseline before award.
Open →OperationsMove from handover into explicit readiness checks, a factual operations log, follow-up plans, issue-linked work, manual resolution review, maintenance budgeting and total cost of ownership without turning checklist completion into an automatic verdict.
Open →Technical toolsUse both directions of the early sizing workflow: people to preliminary main-room area, or available main-room area to preliminary capacity.
Open →Project toolsUse one workflow for project passport, sizing, budget, logistics, funding, supplier comparison, supplier review, acceptance, operational readiness, defect lifecycle, maintenance and TCO.
Open →Capacity, site conditions, project stage, budget, funding, target date and required work should be visible together. That makes technical review, supplier communication and procurement discussions more efficient.
The result is a structured starting brief. It does not replace design, but it makes the next technical discussion more specific.
Build a structured passport first, or send the information you already have. The online enquiry stays on ShelterMetric and can include your project brief.
+380 96 708 91 98Project enquiries · Ukraine